Brand Logo

Quick Select

A concise route from requirements to shortlist

Use four specification rows to prepare a product discussion. The tool does not replace calculation; it makes the first comparison more disciplined.

Start with the installation context

01

Choose application

Select greenhouse, vertical farm, office, retail, education, healthcare, or industrial interior. Note the target plane and operating schedule.

02

Set usable output

Enter PPFD and DLI for crops, or illuminance and distribution needs for commercial interiors. Include uniformity and glare limits where applicable.

03

Define mounting

Record suspension or recessed condition, mounting height, spacing limits, ambient temperature, access, voltage, and required IP rating.

04

Confirm control

Choose 0–10V, DALI-2, scheduling, sensing, gateway integration, or a defined standalone dimming method.

Four rows worth bringing to a quotation

Use values that describe the intended operating condition, not only catalog maxima. A greenhouse target should identify canopy height and photoperiod, while an office target should state workplane height, surface assumptions, and glare criteria. Where inputs are unknown, label them as open decisions so a calculation does not silently convert an estimate into a requirement.

Decision Horticultural project Commercial interior Evidence to request
Output Target PPFD, DLI, uniformity Delivered lumens, lux, uniformity Calculated plane and layout assumptions
Light quality Spectrum and crop strategy CCT, CRI, TM-30, UGR Tested spectral or photometric report
Environment Humidity, temperature, sanitation Ceiling, ambient, task, service access IP rating and operating limits
Control Schedules, zones, dimming range 0–10V, DALI-2, sensors, daylight Wiring and commissioning guidance

A defensible comparison uses the exact optical, electrical, spectrum, and driver configuration proposed. Family-level claims can conceal meaningful differences in distribution, input power, thermal limits, and dimming behavior.

Ready to compare the short list?

Send your four rows and we will help identify the next files, calculations, and configuration checks.

Submit Selection Criteria